Laminar / QA & GMP
Annex 1 requalification records, kept.
As found, reason, retest, reviewer. Every step kept and bound to one revision.
- NDA first
- Back in 5 business days
- Free
- As found · 09:120.5 µm · 4,120 /m³Fail
- Reason logged“Recount after surface clean”
- Retest · 10:400.5 µm · 1,910 /m³Pass
- Reviewer statementSigned · revision 3Frozen
Part 11 / Annex 11 questions welcome
A review record, not an e-signature.
Built to support your validation: every entry attributable, originals never overwritten, the review bound to one frozen revision.
Will it stand up to our Part 11 / Annex 11 validation?
Laminar is built to support your validation. Every entry is attributable (who, when, which instrument), originals are never overwritten, every retest or correction carries a written reason, and the full audit trail exports as CSV or Excel. The sign-off record names the reviewer, the date and time, and a written statement of what they are signing for, bound to the exact frozen, hashed report revision. It is the review record kept in Laminar, not a regulated electronic signature; your validation decides how it maps to your electronic-record and signature procedures. We support it with the audit-trail description, written answers to your supplier questionnaire, and a supplier audit, remote or on site. Download the audit-trail description (PDF).
What an auditor asks
A pass is not a record.
Today
- A final pass, no trail behind it
- Every room on its own clock
- Every visit, a separate PDF
With Laminar
- As found, reason and retest, all kept
- Every room flagged before its limit
- One record, visit after visit
Requalification calendar
Due before the Annex 1 limit.
Every room on its own clock, with the rule behind each date.
- Grade AFilling line12 days
- Grade BRoom 20441 days
- Grade CCorridor5 months
Supplier qualification
Your vendor file, handled.
Your questionnaire answered in writing. NDA first.
- HostingCloudflare · encrypted
- Recovery30-day point in time
- ExportPDF · CSV · XLSX · ZIP
- Audit trailDescription (PDF)
- ConfidentialityNDA signed first
Fair questions
Before you change a workflow.
Criteria built from
- ISO 14644-1
- ISO 14644-3
- USP <797>
- USP <800>
- EU GMP Annex 1
- IEST-RP-CC034
Can a reading be changed after it is entered?
Never silently. A new reading is added beside the original, never edited in place, and every retest or correction carries a written reason. After a logged adjustment, readings taken before it are refused and the item is remeasured; the as-found reading stays beside the retest, each with technician, time and instrument. Readings are never prefilled. The review is recorded against the exact report revision, and every issued report is a frozen, hashed snapshot.
What do we get when our certifier tests in Laminar?
When your certifier issues a report in Laminar, they can give you secure sign-in access to it: every result, every as-found value, every retest and the evidence behind it, exactly as issued. Drafts stay with your certifier. A revision is a new snapshot, and nothing is ever overwritten. A full facility portal, with every room's history behind one login, is coming next. Your certifier can also hand you a room audit bundle (.zip) or a results CSV from their record.
Where is our data, and who can see it?
Encrypted in transit and at rest on Cloudflare's cloud, with point-in-time database recovery across the last 30 days. The hosting region and how backups run are described in writing in your supplier questionnaire answers. Records are archived, never purged by us, and you can take the full export package (PDF, CSV, Excel and .zip audit bundles) at any time, without asking. Only your own organization's staff sign in (admin, reviewer and technician roles), plus the report readers you grant for an issued report.
What does it cost?
The report gap check is free. Your first job on Laminar is free, with no commitment. After that, Laminar is priced per room or per visit, quoted for your rooms on the call. No setup fee: we build your facility from your drawings and past reports.
More questions (5)
How does Laminar map to ALCOA+?
| Attributable | Technician, time and instrument on every entry; role-based sign-in. |
|---|---|
| Legible | Typed on the iPad, never handwritten; reports print to PDF. |
| Contemporaneous | Entered in the room as the reading is taken, offline if need be. |
| Original | Never overwritten: the as-found value stays beside the retest; never prefilled. |
| Accurate | Checked against its limit on entry; after a logged adjustment, earlier readings are refused. |
| Complete | Every retest and correction carries a written reason; the full audit trail exports. |
| Consistent | Time-ordered trail per item; the review is bound to the exact report revision. |
| Enduring | Issued reports are frozen, hashed snapshots; every revision is kept. |
| Available | Export any time: issued reports as PDF, readings and history as CSV, the audit trail as CSV or Excel, a room or facility audit bundle (.zip) and the due list as CSV. |
What if our certifier doesn't use Laminar yet?
Hold the account yourselves and add your certifier's technicians to it: they record in your Laminar, and every room's history, the due list and every issued report stay with your site. Write it into the certifier contract. Start with the free report gap check on your past reports. Here is a note to send them:
How do readings get in from our particle counter?
Each reading goes in once, on the iPad, in the room, with the instrument and its calibration attached. Rows from a counter's printout, or its .csv, .txt or .tsv export, paste straight in. The quick-pick list registers the instruments crews use most: TSI AeroTrak, Lighthouse Solair and Beckman MET ONE counters, ATI photometers, TSI Alnor and Shortridge flow hoods, TSI DP-Calc and Dwyer manometers, TSI VelociCalc and Testo velocity meters. Direct instrument import is coming. The counter's own printout or export stays your raw data.
We live in spreadsheets today. Can we bring history in?
Upload a drawing, a room list or last year's report with the drawing; Laminar proposes rooms, filters and a test plan for your lead to review, every assumption marked for one-tap confirmation. Criteria come from your current requirements, not the old report.
Do the rovers replace technicians?
No. The rovers are a 2027 concept, being designed for the repetitive work: particle counts with the mast at working height, and HEPA filter scans with an aerosol photometer and the mast extended to the ceiling. Technicians keep the balancing, pressure work, repairs and judgement calls, and an experienced reviewer signs. Founding partners get the first rovers. The images are concept renderings.
Free report gap check
Get your free report gap check.
Tell us roughly how many rooms and reports. We reply with the NDA and how to send them.
Book a 30-minute callor send the form and we reply within one business day.
David WeilFounder · a named person, not a ticket queue
- 1 business dayReply, guaranteed
- NDA firstBefore any report
- First job freeNo commitment
Gap check back in 5 business days · Reports deleted within 30 days · Originals never overwritten
Got it — thank you.
We reply within one business day with the NDA and how to send your reports. Hold the reports until then. Emails come from marketing@laminarcert.com; add it to your contacts so it doesn't land in spam.
Urgent? Call +1 (704) 500-8100 and mention your facility.
