Your recent certifications. What's missing?
Send your last 2 or 3 reports. One page back: what dropped out and what moved.
Send your last 2 or 3 certifier reports. One page back: what an inspector may ask.
Send your last 2 or 3 requalifications. One page back: what's missing, what drifted.
Send your last 2 or 3 rounds. One page back: what dropped out between rounds.
Send 2 or 3 past reports for one client, names redacted. One page back.
- NDA first
- Back in 5 business days
- Reports deleted in 30 days
3gaps found
What you get back
One page. Plain language.
It reads the record, not the people: what is in your reports, and what is not.
01 · What's missing
- Counts in operation missing in visit 3
- <800> room: pressure “pass”, no value
02 · What moved
- Buffer room ΔP lower each visit
- Ante HEPA 3 adjusted three times
03 · What an inspector may ask
- Two passes with no as-found value
How it works
Three steps. No software.
- Step 1We sign your NDA.Before you send anything.
- Step 2Send 2 or 3 reports.Redacted is fine.
- Within 5 business daysOne page back.Your reports deleted within 30 days.
Fair questions
About the check.
Criteria built from
- ISO 14644-1
- ISO 14644-3
- USP <797>
- USP <800>
- EU GMP Annex 1
- IEST-RP-CC034
See a sample one-page summary
Report gap check · one-page summary
01 · What's missing
- Buffer room: particle counts in operation in visits 1 and 2, not in visit 3
- PEC 2: smoke study at rest only; dynamic conditions not described
- HD buffer room (<800>): negative pressure recorded as pass, no value
02 · What moved
- Ante room HEPA 3: airflow adjusted at each of the last three visits
- Buffer room pressure differential lower at each visit, still within limit
03 · What an inspector may ask
- Two passes with no as-found value recorded
- One retest with no reason or adjustment noted
Plain language. One page. By email. Yours to keep.
Report gap check · one-page summary
01 · What's missing
- Grade B room: counts in operation in visit 1, at rest only in visit 2
- Grade A zone: airflow visualisation not referenced in the last report
02 · What moved
- Filling room HEPA 4: leak-test penetration higher at each visit, still within limit
- Grade B to C pressure differential lower at each visit (Pa), still within limit
03 · What an inspector may ask
- Recovery test: no result recorded in visit 3
- Two passes with no as-found value recorded
Plain language. One page. By email. Yours to keep.
Report gap check · one-page summary
01 · What's missing
- Bay 3: 4 sample locations in round 3; Table A.1 asks for 6 at this area
- Room 12: 5 µm counts recorded in rounds 1 and 2, not in round 3
02 · What moved
- Room 12: 0.5 µm counts higher at each round, still within ISO 7
- Bay 1 HEPA 2: repaired twice, no retest recorded after the second repair
03 · What an inspector may ask
- Two rounds with no counter serial or calibration date recorded
- Sample volume not recorded for round 2
Plain language. One page. By email. Yours to keep.
Who reads our reports?
The Laminar team, under your NDA, with David Weil, founder, as your direct line. We sign your NDA before you send a single report. Your reports are deleted within 30 days of the check. If the check finds nothing worth your time, we tell you so, in writing.
How many reports should we send?
Certified every six months? Send the last two. Annual? The last two or three. Spreadsheets from your own team are fine too, and redacted reports or a single room are fine.
Is it a rating of our certifier?
No. It reads the record, not the people: it shows what is in the reports and what is not. Your certifier or your own reviewer still signs.
More questions (2)
We are a certification firm. Can we use it?
Yes, as a sales tool: send two of your own past reports for one client, names redacted, and show that client what your next report adds. Or run your first job on Laminar free.
What does it cost?
The report gap check is free. Your first job on Laminar is free, with no commitment. After that, Laminar is priced per room or per visit, quoted for your rooms on the call. No setup fee: we build your facility from your drawings and past reports.
Free report gap check
Get your free report gap check.
Tell us roughly how many rooms and reports. We reply with the NDA and how to send them.
Prefer to talk first?Book a 30-minute call
David WeilFounder · a named person, not a ticket queue
- 1 business dayReply, guaranteed
- NDA firstBefore any report
- First job freeNo commitment
Gap check back in 5 business days · Reports deleted within 30 days · Originals never overwritten
Got it — thank you.
We reply within one business day with the NDA and how to send your reports. Hold the reports until then. Emails come from marketing@laminarcert.com; add it to your contacts so it doesn't land in spam.
Urgent? Call +1 (704) 500-8100 and mention your facility.
